Beautiful home in ånimskog with WiFi | House in Ånimskog

New |   Pet Friendly   1 Bedroom  1 Bathroom  4 Guests
Animskog House | Beautiful home in ånimskog with WiFi

1 Bedroom House in Animskog, Ånimskog

Would you like to experience a vacation in nature and with exciting flora and fauna in Sweden? This vacation home has a fantastic location and enjoys a panoramic view of lake Ånimmen. The house is located on a beachfront property. One of the bedrooms is in the outbuilding, the other in the main house where you will also find the kitchen and living room. Outside you have a large, lovely terrace with a roof at your disposal, so you can spend wonderful evenings with family and friends. This natural area is wooded and you can easily look for berries and edible mushrooms. Moose are also said to be found here.
- Free parking on site
- Electri. inkl in week no 23-35
- Not suitable for youth groups
- Rental not for institutions
- Rental only for holiday lets
Optional:
- Bedlinen incl towels: 200.00 SEK/Per pers. per. stay
- Final cleaning: 1000.00 SEK/Per stay
- Pets: 2

Beautiful home in ånimskog with WiFi is located in Animskog. Beautiful home in ånimskog with WiFi provides accommodation, featuring Oceanfront, Heating, Kitchen, among other amenities. This House features Parking, Pet Friendly and TV to make your stay a comfortable one.

Beautiful home in ånimskog with WiFi has 1 Bedroom , 1 Bathroom, and max occupancy of 4 people. The minimum rental for this property is 1 nights, but this can change depending on the season you plan on staying. Previous guests have given good rated it, and VRBO labeled it a top-rated House because of the excellent services rendered by the owner or manager of this House, and has consistently provided great experiences for their guests. Most families or guests that use it recommend it to their friends and some of them are repeat guests. House has a friendly neighborhood, and the Animskog has interesting places to visit. If you want to learn more about the House in Animskog, such as places to visit and things to do nearby, you can check below to learn more.

Show more
OneKey Logos

This Property is OneKey Eligible

Earn OneKeyCash for every dollar spent on eligible vacation rentals, villas, cottages, cabins, and more when you book on Vrbo.

JOIN TODAY

Amenities

Parking
Pet Friendly
TV
View
Ocean View
Balcony/Terrace
Oceanfront
Security/Safety
Entertainment
Barbecue/Outdoor Cooking
Heating
Internet
Kitchen

Facility Overview

Air Conditioner
  • Heating
Bathrooms
  • Shower
  • 1 bathroom
Bedroom
  • 1 bedroom
  • Bed sheets provided
  • Sofa bed
  • Living room
  • Dining room
Kitchen
  • Coffee/tea maker
  • Cookware/dishes/utensils
  • Refrigerator
  • Stovetop
Parking
  • Onsite parking
Pet Friendly
  • Pet friendly
Accessibility
  • Smoke-free property
Activities
  • Fishing on site
Entertainment
  • TV
  • DVD player
General
  • Unit size: 646 sq ft (60 sq m)
  • Norwegian
  • Italian
  • Spanish
  • Swedish
  • French
  • German
  • Danish
  • English
  • Polish
  • Dutch
  • On the lake
  • Near the sea
  • On the river
Internet
  • Free WiFi
Outdoors
  • Rooftop terrace
  • Terrace
  • Barbecue grill
Security/Safety
  • Smoke detector installed (host has indicated there is a smoke detector on the property)
  • No carbon monoxide detector (host has indicated there is no carbon monoxide detector on the property; consider bringing a portable detector)

Policies

Check-in
Check-in time starts at 4:00 pm minimum check-in age: 18
Check-out
Check-out before 10:00 am
Child Policy
Children are welcome.
Event Policy
No events allowed
Pet Policy
Note from host: this property accepts a maximum of 2 pet(s) pets allowed service animals are welcome, and are exempt from fees
Smoking Policy
Smoking is not permitted

Extra-person charges may apply and vary depending on property policy government-issued photo identification and a credit card, debit card, or cash deposit may be required at check-in for incidental charges host has indicated there is a smoke detector on the property host has indicated there is no carbon monoxide detector on the property; consider bringing a portable detector with you on the trip onsite parties or group events are strictly prohibited special requests are subject to availability upon check-in and may incur additional charges; special requests cannot be guaranteed this property is managed through our partner, vrbo. you will receive an email from vrbo with a link to a vrbo account, where you can change or cancel your reservation

FAQ's

Is this property pet-friendly for guests?

Yes, pets are allowed at this property. Check the guest reviews to learn what guests had to share.

Does the property have a swimming pool?

No, this Animskog house does not have a swimming pool. Check the Facility Overview section for details about the pool and other available facilities.

How much does it cost per night to stay in property?

Best-rates for the Animskog house starts from $446 per night with includes Parking, Pet Friendly, View, Oceanfront, Heating, Kitchen, TV, Ocean View, Balcony/Terrace, Security/Safety, Entertainment, Barbecue/Outdoor Cooking, Internet with all other facilities. matches every traveler with their perfect accommodation, whether you are traveling with a group, friends, family, or pets.

Is property a family-friendly place to stay?

Based on the information we have received from the owner or our partner, this is not considered to be a family-friendly property. As reported by the owner or manager, the house has not specified that children are welcome. Please see details about suitability for your family or inquire with the property to learn more.

Is the property wheelchair accessible or offer services for disabled guests?

Based on the information received from our partner, the Animskog house has not specified they are wheelchair accessible. Likewise, there is not an elevator specified as being available at the property. Specific accessibility details may be addressed in the property details section of this page.

What is the minimum night stay policy for the property?

Based on the information reported by the owner or manager, the Animskog house indicates 1 day stay policy at this house. Guests are cautioned that the minimum stay policy may differ based on seasonality or availability and may be at the discretion of the owner or manager.

What cancellation policy is in place for property?

Guests are cautioned that the cancellation policy may differ based on seasonality, availability, or current travel restrictions. Guests should also be aware that this policy may be subject to change and should be confirmed prior to booking. More details may be available on this page in the property description. However, early check-in or late check-out can sometimes be negotiated between the guest and the owner or the manager of this property.